WHAT ARE WE DOING?

Read about our main activities and the offered by us products.

 


DREDGING ACTIVITY AND PROCESSING

The extraction is performed by dredger which loads the barges with river gravel. The extracted material complies with the essential requirements of Bulgarian State Standard EN 13043: 2003. The ballast is treated by washing and sieving into four types of aggregates.

 

MORE

 


RIVER BALLAST AND FRACTIONS


The ballast is treated by washing and sieving in six types of aggregates for concrete and mortars with dimensions: river sand fraction of 0 / 4mm and shingle fractions of 4 / 8mm, 4 / 16mm, 16 / 31.5 mm, 31.5 / 63 mm, 0/45 mm ....

 

MORE

 


RIVER TRANSPORT


Through the ships The Company carries out transport operations on the Danube. Coal and ore are transported from The City of Izmail (Ukraine) and The City of Reni (Ukraine). The manufactured and produced inert materials are transported through own water transport along the lower Danube.

MORE

 

PROJECTS

  • Giurgiu - Bucharest (Romania) Highway
  • Asparuhov Bridge - Varna (Bulgaria)
  • Bucharest - Constanţa (Romania) Highway

MORE

 

 

LATEST NEWS

 

 

 

 

MORE